Data Centre Growth, Grid Constraints, and Project Management: A Review of Integrated Delivery Approaches
DOI:
https://doi.org/10.66592/jistm.01.02.09Keywords:
data centres, grid connection, demand flexibility, project management, infrastructure governance, energy reliabilityAbstract
Data centres have become one of the fastest-growing sources of electricity demand, and their expansion increasingly depends on the capacity, timing, and reliability of the electricity grid. This review examines how project management practice shapes the outcomes of data centre development where grid interaction is a binding constraint. It draws on literature from power systems, energy infrastructure risk, data centre engineering, and programme and project governance, and organises the evidence around four themes: demand growth and its uncertainty, grid connection and demand flexibility, reliability and asset management of energy infrastructure, and the planning and delivery methods used to coordinate multi-party projects. The review finds that conventional project management tools are widely used to control schedule and cost, but the reviewed sources show that they commonly treat grid connection as an external dependency, which can delay the discovery of capacity limits until late in delivery. Approaches that bring utilities, developers, and equipment suppliers into a shared gated schedule, and that treat demand flexibility as a design variable, appear better suited to the problem. The paper proposes an integrated framework that links grid readiness gates to project phases and identifies research gaps in the empirical measurement of connection timelines and in the governance of flexible loads.